A shared airport picture still needs someone authorised to act
The new Total Airport Management position paper puts decision-making ahead of technology procurement. Here is what that means for an operations centre.
The distinction that matters
A joint November position paper from ACI EUROPE and ACI Asia-Pacific & Middle East argues that Total Airport Management depends on governance, trust and agreed responsibilities. It warns against buying technology before defining the operational problem, assuming more data improves decisions, and creating indicators without an agreed response. Its central distinction is practical: seeing the same situation does not mean stakeholders will make the same decision.
An illustrative stand conflict
Consider an inbound aircraft whose allocated stand remains occupied. The airport may prefer a stand change; the airline may prefer to preserve its passenger connection plan; the handler may have staff and equipment committed elsewhere. A shared display can make the conflict visible. It cannot decide which trade-off is acceptable or authorise each organisation to carry it out. This example is illustrative, not a reported incident.
Define the decision before the display
Our recommendation is to choose one recurring cross-organisational decision and document it completely. Specify the trigger, the information that must be trusted, the available options, the decision owner and the point at which escalation is required. Then test whether the proposed technology makes that decision easier to take and execute.
Measure the unresolved interval
A useful local measure would be the time between recognising a conflict and committing to an agreed response. Another would be the share of interventions that all affected teams acknowledge. These are suggested management measures, not universal industry benchmarks. Their value depends on the airport’s procedures and the decision being studied.
Keep the limits visible
A control-room team also needs to know when the common picture is incomplete. A missing update, an unconfirmed stand status or a conflicting timestamp should affect confidence in the decision. Hiding those limits behind an apparently complete display can make an unresolved situation look settled.
The procurement consequence
Request a demonstration built around a disputed operational decision. Ask each stakeholder to explain what they can authorise, what they must refer elsewhere and how the result reaches the people doing the work. The quality of those answers will reveal more about deployment readiness than the number of feeds on the screen.
Sources
- Total Airport Management — Joint Position Paper — ACI EUROPE and ACI Asia-Pacific & Middle East, 2026-11
Related reading
The hardest part of airport innovation starts after the pilot
A successful trial answers whether a technology can work. An airport still has to decide how it will become part of the operation.
Every airport AI proposal needs a withdrawal plan
Editorial view: the ability to stop relying on a model should be part of its operating design from the beginning.
Why turnaround intelligence belongs inside the Intelligent Apron
ADB SAFEGATE’s acquisition of Synaptic Aviation connects the computer-vision story with a broader operating model: Safedock at the stand, shared apron data and coordinated turnaround decisions.